SNIAM
The building was completed in 2001. It contains 5 storeys above ground plus a basement level. I
Location: Main Campus (Pearse Street side)
Accessibility rating: Building is accessible at all levels
Opening hours
SNIAMS is open from 8am to 6pm daily with after hour's access available through key entry.
Evacuation information
-
Evac Chair is on 2nd floor, middle stairs
- The Lift in the building is protected from the effects of a fire and can be isolated from external control
Building description
The building was completed in 2001. It contains 5 storeys above ground plus a basement level. In the basement there are laser research rooms, a large lecture hall, offices and storage rooms. The Ground Floor contains labs, offices, and the workshop and conference rooms. The 1st to 4th floors house the larger labs; researcher's and staff offices, common room and storage rooms. Floor 5 contains the plant room.
Facilities available
- Lecture Halls
- Science Labs
- Lasers Rooms
- Offices
- Workshop
- Chemical Stores
- Common Area's
- Evac Chair is on 2nd floor, middle stairs